Singapore

Cross Island Line — CR116

Land Transport Authority · CREG EPB TBM · Ø7.2 m

Overview

Contract CR116 carries the Cross Island Line east through built-up ground, driven by 7.2-metre earth-pressure-balance machines on twin-bore running tunnels. Every launch begins the same way — the cutterhead craned down into the shaft and mated to the shield in the confined space of the launch chamber.

Our crew members worked the machine through its lifecycle: shaft assembly and launch, production mining under close face-pressure control, and the cutting-tool interventions that keep a drive on programme in Singapore's mixed ground.

Scope of Works

  • Cutterhead and shield assembly in the launch shaft
  • EPB mining operations and face-pressure control
  • Segment erection and annulus grouting
  • Cutting-tool inspection, intervention and replacement

Gallery

More from our track record

Singapore Circle Line 6 — C882
Land Transport Authority
Circle Line 6 — C882
CREG EPB TBM · Ø6.6 m
View Details ↗
Singapore Thomson–East Coast Line — T302 / T311
Land Transport Authority
Thomson–East Coast Line — T302 / T311
CREG EPB TBM · Ø6.6 m
View Details ↗
Singapore Thomson–East Coast Line — T202 / T211
Land Transport Authority
Thomson–East Coast Line — T202 / T211
Kawasaki Slurry TBM · Ø6.6 m
View Details ↗