Singapore

Thomson–East Coast Line — T202 / T211

Land Transport Authority · Kawasaki Slurry TBM · Ø6.6 m

Overview

Contracts T202 and T211 took the Thomson–East Coast Line through soft marine clay and mixed-face ground along the city's eastern corridor — conditions that called for slurry machines. Six Kawasaki slurry TBMs were deployed across the two contracts.

Slurry tunnelling adds an entire surface plant to the operation. Our crew members ran the machines and coordinated with separation-plant teams, maintaining face stability in ground where settlement tolerances above were measured in millimetres.

Scope of Works

  • Slurry TBM operation and face-pressure management
  • Coordination with slurry treatment plant operations
  • Cutterhead inspections and tool replacement
  • Mechanical and hydraulic systems maintenance

Gallery

More from our track record

Singapore Thomson–East Coast Line — T310 / T316
Land Transport Authority
Thomson–East Coast Line — T310 / T316
STEC TBM · Ø6.6 m
View Details ↗
Indonesia Jakarta MRTJ — CP201
MRT Jakarta
Jakarta MRTJ — CP201
Mitsubishi EPB TBM
View Details ↗
Singapore Thomson–East Coast Line — T202
Land Transport Authority
Thomson–East Coast Line — T202
Kawasaki TBM · Ø6.6 m
View Details ↗