Singapore

Cross Island Line — CR110 / CR115

Land Transport Authority · CREG EPB TBM · Ø12.6 m & Ø7.2 m

Overview

Contracts CRL110 and CRL115 continue the Cross Island Line's bored-tunnel drives with a mixed fleet: a 12.6-metre earth-pressure-balance machine on the large single-bore section and three 7.2-metre EPB machines on the twin-bore running tunnels.

Our crew members supported these drives across the machine lifecycle — from shaft logistics and shield assembly through production mining to maintenance interventions — building the deep familiarity with CREG EPB machines that we now bring to new contracts.

Scope of Works

  • Shield and gantry assembly in launch shafts
  • EPB mining operations and face-pressure control
  • Segment erection and annulus grouting
  • Planned maintenance and cutting-tool changes

Gallery

More from our track record

Singapore Cross Island Line — CR116
Land Transport Authority
Cross Island Line — CR116
CREG EPB TBM · Ø7.2 m
View Details ↗
Singapore Circle Line 6 — C882
Land Transport Authority
Circle Line 6 — C882
CREG EPB TBM · Ø6.6 m
View Details ↗
Singapore Thomson–East Coast Line — T302 / T311
Land Transport Authority
Thomson–East Coast Line — T302 / T311
CREG EPB TBM · Ø6.6 m
View Details ↗