Leadership

The people behind the machines.

Zen Tunnel Engineering was founded in 2023 by a Japanese tunnelling veteran and two Bangladeshi TBM specialists — colleagues across a dozen underground projects, now partners in one company.

Kakita Naoki, Founder — Tunnelling Veteran, Japan
Founder — Tunnelling Veteran, Japan

Kakita Naoki

Kakita-san's career began on Japan's public works — service tunnels, sewer pipelines and water-supply tunnels — where he absorbed the meticulous planning and construction culture that defines Japanese engineering. Those early drives in Hiroshima, Niigata and Yamaguchi taught the fundamentals that no classroom can: ground behaviour, machine rhythm, and the discipline of doing small things perfectly, every ring.

Career Highlights
  • Singapore
    Thomson–East Coast Line — T316 / T310
    STEC EPB TBM drives through the city centre.
  • Singapore
    Thomson–East Coast Line — T202
    Kawasaki TBM running-tunnel drives.
  • Indonesia
    Jakarta MRT — CP202 / CP201
    JIMT and Kawasaki EPB machines beneath one of the world's most congested capitals.
  • Hong Kong
    Express Rail Link — XRL 825
    Herrenknecht TBM drives for the territory's high-speed rail connection.
  • Japan
    Hiroshima Common Service Tunnel
    Urban utility tunnel construction.
Machine Platforms
STEC EPB Kawasaki EPB / Slurry Herrenknecht TBM JIMT EPB
View Full Profile ↗
Jasim Uddin, Director — Mechanical Superintendent
Director — Mechanical Superintendent

Jasim Uddin

Jasim Uddin has spent over 25 years keeping tunnel boring machines alive — assembling them in launch shafts, running them at the face, and fixing them when the ground fights back. He began as a mechanic and welder on Samsung, Taisei and Sembawang tunnel contracts, mastering TBM assembly, dismantling and troubleshooting from the workshop floor up.

Career Timeline
  • 2018 — Present
    Mechanical Superintendent · Yu Sin Engineering Work Pte Ltd
    TBM operations and maintenance supervision, machine and operator scheduling for full tunnel teams — Thomson–East Coast Line and Cross Island Line packages.
  • 2015 — 2017
    Mechanical Superintendent · Penta-Ocean Construction
    Supervision of mechanics and welders in maintenance, repair and assembly on Singapore tunnel works.
  • 2013 — 2015
    Assistant Mechanical Superintendent · MMC-Gamuda KVMRT
    Testing, commissioning, troubleshooting and maintenance of the Klang Valley MRT variable-density TBM fleet.
  • 2007 — 2012
    Senior Mechanical Superintendent · Obayashi Corporation
    Supervision of TBM maintenance, repair and assembly teams.
  • 2006 — 2007
    Mechanic & Welder · Sembawang Corporation
    TBM assembly, dismantling and troubleshooting; workshop welding, cutting, fabrication and equipment installation.
Certifications
Building Construction Supervisors Safety Course Construction Supervisors Safety (Tunnelling) Work-At-Height Course for Supervisors Confined Space Entry & Rescue First Aid, CPR & AED Welder Qualification Test (3G) Skills Evaluation (K) C.I.T.I Project Safety Management — Institute of Power & Gas
View Full Profile ↗
ZI
Director — Tunnel Operations

Mohammad Zahirul Islam

Zahirul Islam's twenty-four years underground cover the full breadth of Singapore's tunnel programme. Most recently he has driven CREG earth-pressure-balance machines on the Cross Island Line's CR111 contract and Herrenknecht EPBs on the Deep Tunnel Sewerage System's T08 — both under KSL Tunnelling. His first deep-sewer drives came far earlier, on DTSS T04 with a Mitsubishi machine under Samsung Corporation.

Career Highlights
  • Singapore
    Cross Island Line — CR111
    CREG EPB TBM drives under KSL Tunnelling Pte Ltd.
  • Bangladesh
    Roads, River Bank Protection & Buildings
    Heavy civil construction — road works, river bank protective works and building construction.
  • Singapore
    Deep Tunnel Sewerage System — T08
    Herrenknecht EPB TBM drives under KSL Tunnelling Pte Ltd.
  • Singapore
    Thomson–East Coast Line — T311
    CREG EPB TBM drives under Yu Sin Engineering.
  • Singapore
    EW2 Cable Tunnel
    Kawasaki Heavy Industries slurry TBM under SK E&C on the island's power cable network.
Machine Platforms
Herrenknecht TBM CREG EPB Robbins EPB Kawasaki Slurry Mitsubishi EPB
View Full Profile ↗

Sixty years of experience, ready for your project.

Talk directly to the people who will run your machines.

Contact Us ↗