Circle Line Stage 6 closed the final gap in Singapore's orbital MRT line, connecting HarbourFront to Marina Bay. Contract C882 deployed four 6.6-metre CREG earth-pressure-balance machines on twin-bore drives beneath some of the island's densest urban fabric.

Our team members served on the contract, handling machine assembly, production tunnelling and end-of-drive dismantling — often recovering machines in tight underground chambers where every lift had to be planned to the centimetre.

Scope of Works

  • TBM assembly and launch for four EPB machines
  • Mining crews for twin-bore drives
  • Underground dismantling and machine recovery
  • Invert and first-stage concrete works

Gallery

More from our track record

Singapore Thomson–East Coast Line — T302 / T311
Land Transport Authority
Thomson–East Coast Line — T302 / T311
CREG EPB TBM · Ø6.6 m
View Details ↗
Singapore Thomson–East Coast Line — T202 / T211
Land Transport Authority
Thomson–East Coast Line — T202 / T211
Kawasaki Slurry TBM · Ø6.6 m
View Details ↗
Singapore Thomson–East Coast Line — T310 / T316
Land Transport Authority
Thomson–East Coast Line — T310 / T316
STEC TBM · Ø6.6 m
View Details ↗