Land Transport Authority · Kawasaki TBM · Ø6.6 m
The Cross Island Line is Singapore's eighth MRT line and its longest fully underground corridor. Contract CRL105 features one of the largest tunnel boring machines ever deployed on the island — a 12.6-metre-diameter CREG slurry TBM driving a single large bore that carries both tracks.
Members of our team worked on the assembly, operation and maintenance of this mega-diameter machine. Operating a slurry TBM of this scale demands precise face-pressure management, disciplined ring-build quality and constant coordination between the surface slurry plant and the crew underground.