Singapore

Thomson–East Coast Line — T310 / T316

Land Transport Authority · STEC TBM · Ø6.6 m

Overview

On contracts T310 and T316, STEC earth-pressure-balance machines drove Thomson–East Coast Line tunnels through the city centre — including sections beneath live infrastructure where every advance was monitored around the clock.

Our founder Kakita Naoki worked both contracts, adding STEC machines to a career already spanning Herrenknecht, Kawasaki and CREG platforms. That cross-platform fluency is one of the core strengths our crews offer.

Scope of Works

  • EPB TBM operation in mixed-face conditions
  • Ring building and grouting operations
  • Machine maintenance between drives
  • Breakthrough and reception works

Gallery

More from our track record

Indonesia Jakarta MRTJ — CP201
MRT Jakarta
Jakarta MRTJ — CP201
Mitsubishi EPB TBM
View Details ↗
Singapore Thomson–East Coast Line — T202
Land Transport Authority
Thomson–East Coast Line — T202
Kawasaki TBM · Ø6.6 m
View Details ↗
Singapore Downtown Line 2 & 3 — C919 / C925 / C927
Land Transport Authority
Downtown Line 2 & 3 — C919 / C925 / C927
Herrenknecht & Robbins TBM · Ø6.6 m
View Details ↗